Introduction to Hive and LLAP
Hadoop is the backbone of big data applications. The hallmark of Hadoop is its efficiency to process large volumes of data on a cluster of commodity servers. Apache Hive is the open-source data warehouse system built on top of Hadoop for querying and analyzing large datasets stored in Hadoop files. One of the greatest challenges that Hive faced was its perceived slow performance. Hive on TEZ was a leap in the right direction for performance. It performed better than its predecessor MR execution engine. LLAP, known as Long Live and Process, essentially is the next-generation execution engine with a better performance and response time. LLAP is very similar to Hive, the main difference being the worker tasks runs inside LLAP Daemons and that too inside tiny computational units called Executors. However, in Hive, these tasks are run by containers. The LLAP daemons are persistent and execute fragments of Hive Queries.
What are the core components of Hive LLAP?
Hiveserver2Interactive Process: The code of the Hiveserver2Interactive Process is based on Hive2, with some major variations from the present codebase of HiveServer2, which is based on Hive1. This is true for HDP 2.6. However, from HDP 3.0 the HiveServer2Interactive and HiveServer2 will be the same.
SliderAM: Slider Application Master
LLAP Daemons: These are big fat Yarn containers with an application ID.
YARN Resources: Specially allocated Yarn Queues are needed for LLAP to run. In the example, as shown below, we are using a special Queue called LLAP. The queue is named from Yarn Queue Manager and suitable resources are allocated to the customized queue.
We will have to enable Yarn Pre-emption for LLAP to work.
Ambari àYarn
Fig 1
Yarn preemption is enabled to make sure that the queue has a guaranteed level of cluster resources.
In the present example, as illustrated below, we are allocating 80% of the cluster resources to the queue LLAP.
Screenshot from Yarn Queue Manager.
Fig 2
There is no good number for the resource allocation, we will need to consider the resources that will be needed by LLAP along with the maximum resources that are available in the cluster. In the test cluster used by the author, no other applications are running and is a test box for LLAP applications. (It should also be noted that the memory configurations demonstrated in this document may not be optimal. Viewers are advised to test and change the configurations consistent with their environment and the workload). So, the resources queue is skewed for LLAP intentionally. LLAP, in general, is a resource-intensive service and there is no good answer to the question of how many resources are needed to run LLAP in a cluster.
Yarn Min and Max Containers and its Impact on LLAP Daemons.
Please navigate to AmbariàYarnàConfigs.
Fig 3
As illustrated in Fig3, we have set Yarn Minimum Container Size to 1GB and the Yarn Maximum Container Size is set to 3GB. The size of the LLAP daemon size should be set between the Yarn Minimum Container size and Maximum Container size. Failure to do so will result in a similar error as reported by a few customers, which is highlighted.
--------------------------------------------------------------------------------------------------------------------------------
WARN cli.LlapServiceDriver: Ignoring unknown llap server parameter: [hive.aux.jars.path] Failed: Working memory (Xmx=60.80GB) + cache size (42.00GB) has to be smaller than the container sizing (64.00GB) java.lang.IllegalArgumentException: Working memory (Xmx=60.80GB) + cache size (42.00GB) has to be smaller than the container sizing (64.00GB) at com.google.common.base.Preconditions.checkArgument(Preconditions.java:92) at org.apache.hadoop.hive.llap.cli.LlapServiceDriver.run(LlapServiceDriver.java:256) at org.apache.hadoop.hive.llap.cli.LlapServiceDriver.main(LlapServiceDriver.java:113)
--------------------------------------------------------------------------------------------------------------------------------
Fig 4
The above error stack also represents a different error too. The cache size plus the heap size should also be lesser than the maximum container size. It is highlighted in green color.
Queue Size Calculation for the YARN Queue LLAP:
Size of Slider AM + (n * Size of LLAP Daemons) + Tez-AM Coordinators
Upon successfully allocating the queue resources for the LLAP queue, we need to make sure that the LLAP applications are run in the LLAP queue. This is a manual process and should be done via Ambari.
Screenshot from Ambari àHive.
Fig 5
NB: This will specify that the LLAP daemons and the container will be running in the LLAP queue.
Fig 6
LLAP daemons are launched as Yarn Applications with the aid of Apache Slider.
A screenshot from Resource Manager UI:
Fig 7
The above said application is the slider process that runs the LLAP Daemons. If you click on the application ID, you will reach the following page.
Fig 8
Upon double-clicking the appattempt, a new page opens up. For the scope of the document, only certain sections of the RM UI page will be extracted and presented.
Fig 9
We see 3 containers here.
container_e06_1524044386212_0025_01_000001
container_e06_1524044386212_0025_01_000002
container_e06_1524044386212_0025_01_000003
The first container belongs to the Slider AM. The size of the slider is determined by the configuration as shown in the below picture.
Fig 10. A
Setting LLAP Daemon size:
It is very important to keep the Yarn Node Manager size when we design the LLAP daemon size. The Daemon size cannot bigger than yarn.scheduler.maximum-allocation-mb and cannot be lesser than yarn.scheduler.minimum-allocation-mb. Inside the daemon lies the executors. Typically, each executor needs 4 GB of memory. Executor memory size is shared between join hash table loading, map-side aggregation hash tables, PTF operator buffering, shuffle and sort buffers. If we give less memory to the executors, it can slow down some queries.eg: Hash join can convert themselves into sort-merge joins. However, configuring more memory can be counterproductive too. It may be possible to have more room for hash joins, but query performance may be affected when all the executors load huge tables resulting in GC pauses.
From Fig 10 A, we can see 2 more containers ending in 000002 and 000003. These are the LLAP Daemons. The size of these LLAP Daemons are controlled by the configuration parameter (hive.llap.daemon.yarn.container.mb) (as shown in the below said figure, Fig 10.B)
Fig 10.B
Fig 11
The above-said setting corresponds to Tez AM coordinator. The number of Query Coordinators spun up limits, the number of concurrent queries. It is these Tez AM’s that speak to executors inside the LLAP daemon. An ideal number of concurrent queries would depend on system resources and the workload. The LLAP daemon and the Tez AM coordinators run on Yarn.
Number of LLAP Daemons
Fig 12
We can regulate the number of LLAP daemons using the above-shown configuration. As per the above, we will be able to see 2 Hive -LLAP daemons. You may please refer to the RM UI (Fig 9)for checking the number of LLAP Daemons for further confirmation. (NB: Watch out for the containers ending in 000002 and 000003)
Ports Used for Hive LLAP
Fig 13
Hiveserver2Interactive Heap Size
Fig 14
Hiveserver2Interactive has its own heap size. This is different from the heap size of Hiverserver2. We connect to Hiveserver2Interactive using beeline and the queries run via beeline. The hiveserver2interactive process will use the heap size of Hiveserver2Interactive as specified in the above-said configuration. It should be noted here that LLAP can be connected only via the beeline and it does not have a Hive CLI access.
Execution Flow of LLAP
Users can connect to LLAP via beeline.
Users can use the Zookeeper string to connect to Hiveserver2Interactive.
The JDBC connection connects to Hiveserver2Interactive which is the query endpoint.
The query is compiled by HiveServer2Interactive.
The compiled form of the query will be sent to the Query Coordinators for execution.
Each of the coordinators will take one query and will execute it end to end.
The number of Query Coordinators spun up limits the number of concurrent queries.
The Query Coordinators will send fragment of the query to the executors along with the data they executors needs to work on.
The executors will work on the tiny fragments of the query.
Upon finishing the query, the Tez Query Coordinators will return the results back to the customer.
Fig 15
LLAP daemons are computer nodes that do 2 things.
IO subsystem, which has a shared cache.
Query executors: A multi-threaded query execution engine that can run multiple fragments at the same time.
Limitations to Hive-LLAP :
Hive-LLAP does not support impersonation. Hence hive.server2.enable.doAs should be set to false.
There is no support for Hive-LLAP HA in HDP 2.6.5.
The compiler depends on the table, partition and columns statistics to generate optimal query plan. Hence keeping table, partition and column statistics up to date is very much important for LLAP compiler.
More graphics for Hive LLAP:
LLAP does have some inbuilt graphical representations.
Navigate to
http://llap-node:15002/
Fig 16
Some other helpful metrics:
/jmx – shows various useful metrics like (1. Executor status, 2. daemon.log.dir,3. ExecutorMemoryPerInstance)
/stacks - shows daemon stacks – threads that process query fragments are TezTR-*and IO-Elevator-Thread*
/conf – shows LLAP configuration (the values actually in use)
/iomem (only in 3.0) – shows debug information about cache contents and usage
/peers – shows all LLAP nodes in the cluster
/conflog (only in 3.0) – allows one to see and add/change logger and log level for this daemon without restart
... View more
12-20-2019
09:26 AM
2 Kudos
Introduction to Application Timeline Server
All the metrics of applications, either current or historic, can be retrieved from Yarn through Application Timeline Server. This will include pieces of information like the number of map tasks, reduce tasks, counters, etc. Application developers can publish the specific information to the Timeline server via TimelineClient in the Application Master and/or the application’s containers. The information is then queryable via REST APIs. The above said are the artifacts of the present application.
Also, generic information of completed applications like queue-name, user information a list of application-attempts that ran for an application, information about each application-attempt can be stored in the Application Timeline Server.
Let us delve into a live example of an Application Server. We are using HDP 3.1 cluster in this example.
Note: The following is for Hadoop Version:
The following is a demonstration of Time Service and Timeline Service reader from Ambari UI:
It should be noted that the Timeline Server and Timeline Reader exists as a different process in the cluster, and it may or may not be collocated. The following is the output of ps -ef | grep ‘timeline server’ from the machine in which Timeline Server is installed:
Timeline Server
In the example demonstrated in this document, we are restricting ourselves to an embedded HBASE storage. (Note: Other storage options like standalone HBase or external HBase storage options are beyond the scope of this document).
This means that Yarn creates an Embedded HBase by default:
Process capture of Embedded HBase
Flow Chart of Metrics Collection to Storage(Hbase)
(Image Source: Publishing_application_specific_data)
Demystifying the Flow Chart of Metrics Flow
The general concept is that the application submission client submits an application to the Resource Manager via Yarn Client Object to request needful resources for its usage. The Resource Manager(RM) will launch the Application Master on an allocated container. From this point onwards Application Master (AM) becomes the actual owner of the job. The AM communicates with YARN cluster and handles application execution. During the application launch time, the main tasks of the AM include communicating with the RM to negotiate and allocate resources for future containers, and after container allocation, communicating YARN Node Managers (NMs) to launch application containers on them.
Metrics Flow from Resource Manager (RM) to Storage: The resource manager has its dedicated in-process collector. The application related metrics like how many containers are used in a certain application, how many attempts for a job, queue details and scheduler statistics will be written to the Storage using in-process timeline collector.
Application Master(AM), has its metrics flow action, which is similar to RM. For example, an application or AM is running on a certain Node Manager. The application-specific container-related metrics will be written by the timeline collector to the storage. Every AM has its exclusive Timeline collector which will collocate in the same hosts as the AM.
Node Manager(NM) workflow action is unique. The collectors (writers) are currently embedded in the node managers as auxiliary services. Node Manager containers like, how much resources are allocated per container, resources being used by the container, when the containers are allocated for that application, when the containers are released from that corresponding application would be generated. These artifacts are written by the embedded timeline collector to the storage.